查看原文
其他

正式公告 | 深圳湾超级总部基地片区综合交通提升规划与交通详细规划国际咨询

Open Call | International Consultation on the Comprehensive Transportation Improvement Planning and Detailed Transportation Planning of Shenzhen Bay Super Headquarters Base



 1  项目概况 Project Overview


深圳湾超级总部基地位于深圳市华侨城南部滨海地区,是塘朗山-华侨城-深圳湾城市功能空间轴的核心区段之一。该片区南接深圳湾,与香港隔海相望,北倚华侨城内湖湿地,西邻沙河高尔夫球场,东至华侨城欢乐海岸;城市轨道2号线、9号线、11号线(机场快线)等在该片区交汇,使该片区成为环深圳湾地区自然景观条件得天独厚、城市门户形象突出、未来城市综合开发价值极高的区域。近期将同步开展城市设计优化、片区综合交通提升规划与交通详细规划、智慧城市研究、片区统筹开发建设与运营四项专题工作,要求各专题统筹协同,充分对接。


本次交通规划核心研究范围为滨海大道、深湾一路、深湾五路、白石三道、白石路所围合的区域,用地面积117公顷;规划研究范围扩展至北环大道,滨海大道,沙河西路,侨城东路围合的区域。


Located in the southern coastal area of Shenzhen OCT, Shenzhen Bay Super Headquarters Base is a core segment of theTanglang Mountain-OCT-Shenzhen Bay urban functional space axis. It adjoins Shenzhen Bay on the south, overlooking Hong Kong across the sea, the inner lake wetland of OCT on the north, Sand River Golf Course on the west, and OCT Harbor on the east. Urban railway Line 2, 9 and 11 (airport express line) intersect here, making it an area with unique natural landscape, prominent urban gateway image and high value of integrated urban development in the future. Recently, we will simultaneously undertake four specialized studies, namely, the urban design optimization, comprehensive transportation improvement planning and detailed transportation planning, research on smart city, and coordinated development, construction and operation of the area, while each study is required to fully coordinate and connect with each other.


The core research scope of this transportation planning is the area enclosed by Binhai Boulevard, Shenwan 1st Road, Shenwan 5th Road, Baishi 3rd Road and Baishi Road, with a land area of 117 Hectares, while its research scope is expanded to the area enclosed by  Beihuan Boulevard, Binhai Boulevard, Shahe West Road and Qiaocheng East Road.


深圳湾超级总部基地片区综合交通提升规划与交通详细规划核心研究范围

Core Research Scope of the Comprehensive Transportation Improvement Planning and Detailed Transportation Planning of Shenzhen Bay Super Headquarters Base


深圳湾超级总部基地片区综合交通提升规划与交通详细规划研究范围

Research Scope of the Comprehensive Transportation Improvement Planning and Detailed Transportation Planning of Shenzhen Bay Super Headquarters Base



 2  工作内容 Planning Content


本次交通规划国际咨询需结合城市设计优化专项设计开展交通规划—交通设计—交通建设运营的全过程咨询服务,具体分两阶段工作。


第一阶段:由入围设计机构结合既有城市设计与地下空间规划,明确片区综合交通运输体系发展目标和策略,梳理并提出规划路网及地下道路网络、轨道、枢纽、常规公交、慢行、停车、交通管理及交通智慧化等系统的初步方案,落实初步可行性,并提出片区整体交通的规划—交通设计—交通建设运营全过程初步解决方案。


第二阶段:第一名方案设计机构与技术咨询服务单位共同深化完善第一阶段成果,开展轨道、枢纽及重要道路(含地下道路网络)交通详细规划,并与其他专题,尤其是城市设计优化专项设计做好协同对接工作,形成深圳湾超级总部基地片区综合交通提升规划与交通详细规划最终成果。


In combination with the urban design optimization, this international consultation on transportation planning shall carry out the whole-process consulting service from transportation planning and design to traffic management, which will consist of two phases.


Phase1: In combination with its current urban design and underground space planning, the shortlisted design firms shall define the development goal and strategy of the area's comprehensive transportation system, sort out and propose a preliminary planning scheme for these systems inaspects of planned roads network and underground roads network, urban railway, hubs, conventional buses, slow traffic, parking, traffic management, smart traffic and etc., ascertain its feasibility, and bring forward a preliminary solution for its whole process from transportation planning and design to traffic management.


Phase2: The 1st place shall work with the technical support team to deepen and refine the deliverables of Phase 1, carry out detailed transportation planning for urban railway, hubs and important roads (including underground roadsnetwork), coordinate and connect with the other specialized studies, especially the urban design optimization, to form the final deliverables for the Comprehensive Transportation Improvement Planning and Detailed Transportation Planning of Shenzhen Bay Super Headquarters Base.



 3  报名要求 Registration Requirements


(1)本次咨询活动不设资质要求,国内外设计机构均可报名参加,接受联合体报名,不接受个人名义报名。


(2)要求参与国际咨询的设计机构指派的项目负责人及团队主要成员具有同类项目设计与全过程咨询经验(提供相关证明材料)。


This international consultation is open to design firms or consortiums home and abroad, while personal registration won’t be accepted.


It's required that the project principal and key team members of the participating design firms shall have experience in similar projects and whole-process consulting (relevant proofs shall be submitted).



 4  工作安排 Work Schedule


本次国际咨询包括资格预审、方案评审、成果整合三阶段。


第一阶段资格预审:本次国际咨询在全球范围内公开征集设计机构参与。由资格预审委员会对报名的设计机构进行预审,从中择优选取6家设计机构参与下一阶段方案设计;


第二阶段方案评审:由方案评审委员会对6家设计机构提交的方案设计成果及全过程初步解决方案进行评审,确定3名不排序优胜方案;由深圳湾超级总部基地开发建设指挥部对3名优胜方案进行审议,确定第一名方案;


第三阶段成果整合:第一名方案设计机构与技术咨询服务单位共同深化完善方案评审成果,开展轨道、枢纽及重要道路(含地下道路网络)交通详细规划,并与其他专题,尤其是城市设计优化专题做好协同对接工作,形成深圳湾超级总部基地片区综合交通提升规划与交通详细规划最终成果,报深圳湾超级总部基地开发建设指挥部审批。主办方后续将组织3~4次工作坊,3家优胜设计机构须派主创人员参加。


前三名优胜方案设计机构将有机会优先参与主办方后续组织的专题设计工作。


This international consultation will consist of three stages, namely, "Prequalification", "Evaluation" and "Integration of Deliverables".


Stage 1-Prequalification: This international consultation is open to all design firms worldwide. The jury panel of prequalification will assess the registered design firms and select 6 design firms for the next stage of schematic design;


Stage 2-Evaluation: The jury panel of design scheme will evaluate the design deliverables and preliminary whole-process solutions submitted by these 6 firms and select 3 winning schemes without ranking; the Development and Construction Headquarters of Shenzhen Bay Super Headquarters Base will review these 3 winning schemes and finalize the 1st place;


Stage 3-Integration of Deliverables: The 1st place shall work with the technical support team to deepen and refine the deliverables, carry out detailed transportation planning for urban railway, hubs and important roads (including underground roads network), and coordinate and connect with the other specialized studies, especially the urban design optimization, to form the final deliverables for the Comprehensive Transportation Improvement Planning and Detailed Transportation Planning of Shenzhen Bay Super Headquarters Base, and submit them to the Development and Construction Headquarters of Shenzhen Bay Super Headquarters Base for reviewand approval. The Organizer will organize 3 to 4 workshops afterwards, and the 3 winning design firms should assign their chief designers to participate in the workshops.


The top three places will be given priority to take part in follow-up specialized design held by the Organizer.


时间安排详见下表:

The timetable is as follows:


时间

Deadline

事项

Activities

第一阶段 资格预审

Stage 1 Prequalification

2018年9月7日

Sep .7, 2018

发布正式公告及咨询要求

Release the official  announcement and consultation requirements   

2018年9月18日

Sep.18, 2018

提交电子报名资料,报名截止

Deadline for submitting  electronic registration materials

2018年9月21日

Sep.21, 2018

提交纸质报名资料(本次咨询以收到纸质报名材料为准)

Submit the hardcopies  of registration materials (the effectiveness of registration is subject to the receipt of the hardcopies)

2018年9月26日

Sep.26, 2018

由资格预审委员会对报名材料进行资格预审,择优选取6家设计机构入围

The  jury panel of prequalification will access the registration materials and select  6 design firms

2018年9月27日

Sep.27, 2018

公布资格预审结果,发出入围通知书及技术任务书

Release  the prequalification result, and issue the shortlist notice and design brief

第二阶段 方案评审

Stage 2 Evaluation‍

2018年9月30日

Sep.30, 2018

组织踏勘、答疑

Site visit and Q&A

2018年11月23日

Nov. 23,  2018

提交设计成果

Submission of design deliverables

2018年11月29日

Nov. 29,  2018

召开方案评审会

Hold the evaluation meeting of design deliverables

2018年11月30日

Nov.30, 2018

公布方案评审结果

Release the evaluation result

2018年12月中旬

Mid Dec.,  2018

公布第一名设计机构

Announce the 1st place

第三阶段 成果整合

Stage 3 Integration of Deliverables

2018年12月-2019年3月

Dec. 2018-Mar., 2019

成果深化完善与统筹协同

Integration, refinement and coordination of deliverables

注:上表为北京时间,主办方保留调整日程安排的权利。

Notes: All the time and dates are shown in Beijing Time. The Organizer reserves the right to adjust the schedule.



 5  咨询奖励 Bonus


本次国际咨询奖励如下:

一等奖(1名): 500万元人民币(包含方案设计、成果深化完善、工作坊相关费用);

二等奖(2名):各150万元人民币(包含方案设计、工作坊相关费用);

其他入围机构(3名):各80万元人民币(方案设计费用)


The bonus of this international consultation is as follows:

First place (1): RMB Five Million Yuan (including related expenses such as schematic design, deepening and refinement of deliverables, and workshops);

Second place (2): RMB One Million Five Hundred Thousand Yuan each (including related expenses such as schematic designand workshops);

The other finalists (3): RMB Eight Hundred Thousand Yuan each (for schematic design).



 6  资料索取及联络 

Information Request and Contact


点击下方阅读原文下载:

附件1:第一部分:工作规则

附件2:第二部分:咨询要求

咨询电话:钟小姐 0755-83500184(+86 13425125933)

邮箱:sztc@sztc.com


Click Read More at the bottom of the page to download:

Appendix1: Part I Working Rules

Appendix2: Part II Consultation Requirements

Enquiry: Ms. Zhong +86 755-83500184 (+86 13425125933)

Email: sztc@sztc.com



 7  主办方及组织方 Organization


主办方:深圳湾超级总部基地开发建设指挥部办公室

承办方:深圳市投资控股有限公司

技术咨询服务单位:深圳市城市交通规划设计研究中心有限公司

组织咨询服务单位:深圳市国际招标有限公司

国际咨询招标公告发布平台:深圳市建设工程交易服务网


Organizer: Shenzhen Bay Super Base Construction Headquarters Office

Undertaker: Shenzhen Investment Holdings Co., Ltd.

Technical Support: Shenzhen Urban Transport Planning Center Co., Ltd.

Organizing Consultant: Shenzhen International Tendering Co., Ltd.

Website to Release Announcement: Shenzhen Construction Engineering Trade Service Center




您可能也对以下帖子感兴趣

文章有问题?点此查看未经处理的缓存