张津瑜厕所门事件 8分钟视频9分52秒流出

【少儿禁】马建《亮出你的舌苔或空空荡荡》

母子乱伦:和儿子做了,我该怎么办?

快消管培生补招|世界500强雀巢惠氏招聘客户发展管培生!简历直投HR邮箱,一周内回复

突发!浪潮被列入实体清单,会是“华为模式”还是“中兴模式”?

生成图片,分享到微信朋友圈

自由微信安卓APP发布,立即下载! | 提交文章网址
查看原文

Chengdu Metro Line 18 is Officially Open!

ChengduExpat ChengduExpat 2020-11-05

          🚆             


Big news for the Chengdu Metro today, phase 1 of Metro Line 18 is now open!

Running both above and below the ground, phase I of Line 18 is a relief for people living and working in the south, and other looking to visit Xinglong or Sancha lake. Probably more exciting will the opening of phase 2, expected to be in operation by the end of 2020, connecting Chengdu's urban area with the brand new Chengdu Tianfu International Airport!


Chengdu Metro Line 18, phase 1 and 2


Where does Phase 1 of Metro Line 18 goes?


Phase 1

Open now, phase 1 of Metro Line 18 starts at Chengdu South Railway Station and ends at Sancha Lake, striving to relieve the constant rush of Line 1 in the south, as it runs parallel to it. 

Timetable



Where will Phase 2, 3 and 4 of Metro Line 18 go?


Phase 2

The total length of phase 1 and 2 is 66.2 km (41.1 mi). The line will feature distinct express and local services using passing tracks at selected stations with an express service stopping only at 4 intermediate stations. It aims to complete a trip between Chengdu South Railway Station to Chengdu Tianfu International Airport in 35 minutes. The local service will stop at all stations on Line 18 and will complete the trip in 40 to 50 minutes.

Phase 3 & 4

Line 18 Phase 3 includes North Extension, Linjiang Section, and South Extension. It is 16.72 kilometers long, all underground. In total, 6 underground stations (4 transfer stations), 1 reserved station, and 1 new depot will be built. Phase 4 to be extended to Jianyang South Railway Station.


The stops on Line 18 will be:


Phase 1

South Railway Station - Incubation Park - Jincheng Plaza East - Century City - Haichang Road - Western China International Expo City - Xinglong - Sancha 


Phase 2

Futian - Terminal 3 & 4 of Tianfu International Airport - Terminal 1 & 2 of Tianfu International Airport


Stations that Passengers can Transfer:


There are a few major stations where passengers can make transfers to different lines.

•South Railway Station: Transfer with line 1 and 7

•Incubation Park: Transfer with line 9

•Century City & Haichang Road: Transfer with line 1

•Western China Int'l Expo City: Transfer with line 1 and 6



More Details:


-Maximum capacity: 2958 passengers

-Maximum operating speed: 140km/h

-Ticket price from South Railway to Sancha station: 9RMB


The metro in Chengdu was first opened in 2010 and currently has 7 lines operating Line 1, 2, 3, 4, 5, 7 and 10. There are automatic ticket stations available at each station where passengers can purchase tickets or top up their metro card in Chinese or English. Ticket prices start from 2RMB for a 0-4km journey up to 10RMB when going over 50km and more for a return ticket. 


Line 18 is not the only metro line being constructed as there are is a significant amount of lines that are in planning or currently being constructed.


Chengdu Metro Planning Map

Metro Line 18 is teal on the map

You may be wondering "Which teal"? 

The one right parallel to Line 1, east side.


Jincheng Plaza Station



Century City Station



Western China Int'l Expo Station



Sancha Lake Station




🚊

Will you use Metro Line 18 or which other one are you waiting for?


Let us know in the comments below!




Read More

A Guide to Mid-Autumn Festival Gift-Giving


Sichuan Accommodation Registration Goes Online!


Top 20 Apps You Can't Live Without in China


Helpful Western Medicines in Chinese


Help Us Catch Chengdu Dog Thief


Top 11 WeChat Mini-Programs


Chengdu Aerial photography




Want to make living in the city easier?


Tap below for an English language City Guide

    文章有问题?点此查看未经处理的缓存