Chengdu Metro Line 18 is Officially Open!
🚆
Big news for the Chengdu Metro today, phase 1 of Metro Line 18 is now open!
Running both above and below the ground, phase I of Line 18 is a relief for people living and working in the south, and other looking to visit Xinglong or Sancha lake. Probably more exciting will the opening of phase 2, expected to be in operation by the end of 2020, connecting Chengdu's urban area with the brand new Chengdu Tianfu International Airport!
| Chengdu Metro Line 18, phase 1 and 2
Where does Phase 1 of Metro Line 18 goes?
Phase 1
Open now, phase 1 of Metro Line 18 starts at Chengdu South Railway Station and ends at Sancha Lake, striving to relieve the constant rush of Line 1 in the south, as it runs parallel to it.
Timetable
Where will Phase 2, 3 and 4 of Metro Line 18 go?
Phase 2
The total length of phase 1 and 2 is 66.2 km (41.1 mi). The line will feature distinct express and local services using passing tracks at selected stations with an express service stopping only at 4 intermediate stations. It aims to complete a trip between Chengdu South Railway Station to Chengdu Tianfu International Airport in 35 minutes. The local service will stop at all stations on Line 18 and will complete the trip in 40 to 50 minutes.
Phase 3 & 4
Line 18 Phase 3 includes North Extension, Linjiang Section, and South Extension. It is 16.72 kilometers long, all underground. In total, 6 underground stations (4 transfer stations), 1 reserved station, and 1 new depot will be built. Phase 4 to be extended to Jianyang South Railway Station.
The stops on Line 18 will be:
Phase 1
South Railway Station - Incubation Park - Jincheng Plaza East - Century City - Haichang Road - Western China International Expo City - Xinglong - Sancha
Phase 2
Futian - Terminal 3 & 4 of Tianfu International Airport - Terminal 1 & 2 of Tianfu International Airport
Stations that Passengers can Transfer:
There are a few major stations where passengers can make transfers to different lines.
•South Railway Station: Transfer with line 1 and 7
•Incubation Park: Transfer with line 9
•Century City & Haichang Road: Transfer with line 1
•Western China Int'l Expo City: Transfer with line 1 and 6
↓
More Details:
-Maximum capacity: 2958 passengers
-Maximum operating speed: 140km/h
-Ticket price from South Railway to Sancha station: 9RMB
The metro in Chengdu was first opened in 2010 and currently has 7 lines operating Line 1, 2, 3, 4, 5, 7 and 10. There are automatic ticket stations available at each station where passengers can purchase tickets or top up their metro card in Chinese or English. Ticket prices start from 2RMB for a 0-4km journey up to 10RMB when going over 50km and more for a return ticket.
Line 18 is not the only metro line being constructed as there are is a significant amount of lines that are in planning or currently being constructed.
| Chengdu Metro Planning Map
Metro Line 18 is teal on the map
You may be wondering "Which teal"?
The one right parallel to Line 1, east side.
Jincheng Plaza Station
Century City Station
Western China Int'l Expo Station
Sancha Lake Station
🚊
Will you use Metro Line 18 or which other one are you waiting for?
Let us know in the comments below!
Read More
A Guide to Mid-Autumn Festival Gift-Giving
Sichuan Accommodation Registration Goes Online!
Top 20 Apps You Can't Live Without in China
Helpful Western Medicines in Chinese
Help Us Catch Chengdu Dog Thief
Want to make living in the city easier?
Tap below for an English language City Guide
⇣