新概念英语第二册音频+视频讲解:Lesson 64(可下载)
▲1-9年级语数英上册电子课本免费领▲
教学视频
Lesson 64
The Channel Tunnel
海峡隧道
First listen and then answer the question.
听录音,然后回答以下问题。
Why was the first tunnel not completed?
In 1858, a French engineer, Aime Thome de Gamond, arrived in England with a plan for a twenty-one-mile tunnel under the English Channel.
1858年,一位名叫埃梅.托梅.德.干蒙的法国工程师带着建造一条长21英里、穿越英吉利海陕的隧道计划到了英国。
He said that it would be possible to build a platform in the centre of the Channel.
他说,可以在隧道中央建造一座平台,
This platform would serve as a port and a railway station.
这座平台将用作码头和火车站。
The tunnel would be well-ventilated if tall chimneys were built above sea level.
如果再建些伸出海面的高大的烟囱状通风管,隧道就具备了良好的通风条件。
In 1860, a better plan was put forward by an Englishman, William Low.
1860年,一位名叫威廉.洛的英国人提出了一项更好的计划。
He suggested that a double railway-tunnel should be built.
他提议建一条双轨隧道,
This would solve the problem of ventilation, for if a train entered this tunnel, it would draw in fresh air behind it.
这样就解决了通风问题。因为如果有列火车开进隧道,它就把新鲜空气随之抽进了隧道。
Forty-two years later a tunnel was actually begun.
42年以后,隧道实际已经开始建了。
If, at the time, the British had not feared invasion, it would have been completed.
如果不是因为那时英国人害怕入侵,隧道早已建成了。
The world had to wait almost another 100 years for the Channel Tunnel.
世界不得不再等将近100年才看到海峡隧道竣工。
It was officially opened on March 7,1994, finally connecting Britain to the European continent.
它于1994年3月7日正式开通,将英国与欧洲大陆连到了一起。
免责声明:以上图文由英语视线整理于网络,我们尊重原创,文章版权及插图属于原作者。如果分享内容在版权上存在争议,请与我们联系,我们会及时处理。谢谢!
▲长按扫描二维码
关注后发送消息“新概念英语”
点击“阅读原文”查看往期内容