初心如磐,砥砺重生 | 太平桥公园
July Thematic
★ 7月专题 ★
图文供稿/ DLC 地茂景观
Contributor/ Design Land Collaborative Ltd (DLC)
所有图文版权归地茂景观设计咨询(上海)有限公司所有
All copy rights reserved by Design Land Collaborative (DLC)
■ No.002
人群聚集观看夜晚水幕电影
Crowds gather to watch the evening dancing fountain show
经过多元层次的影响变化,如今的太平桥公园能在不断变化的上海都市核心区,以及在人们的日常体验中,激发探索欲望,促进社区健康、提升生活品质、培养人们的好奇心并鼓励教育的融入。Through layers of change, Taipingqiao Park currently evokes a sense of discovery, promotes healthy communities and quality of life, nurtures curiosity and encourages education within everyday experiences at the heart of an evolving Shanghai.
效果图
Rendering
This is a story of urban transformation, a visual narrative demonstrating how the city and it's urban space evolves over time, designed not by one individual, but born through the momentum of administrative, social, economic and environmental forces and a team of people who celebrate cities and their complexities, contradictions and constraints and promote their continued evolution. This is a story of how cultural heritage can be an asset that can enhance the identity of a place.
1921年7月23日,中国共产党第一次全国代表大会在上海石库门建筑内召开,地点位于黄浦区原法租界兴业路76号 (原望志路106号),毗邻当今的新天地。由于受到威胁和保密工作的需要,会议被转移到嘉兴南湖的一艘渔船上继续进行,此次会议的召开宣告了中国共产党的成立。
The First National Congress of the Chinese Communist Party was held in Shanghai on July 23, 1921 in a Shikumen House, No. 76, Xingye Road (formerly 106, Wangzhi Road) in the (Former French Concession) area of Huangpu District adjacent to present-day Xintiandi. Due to the threat of harassment and a need for more secrecy, the meeting was relocated to a boat on South Lake in Jiaxing to conclude with the establishment of the Chinese Communist Party.1921年7月23日,中共第一次代表大会
The First National Congress of the Chinese Communist Party, July23, 1921
“365计划”是上海市政府发起的一项更新计划,要求上海市中心的每个区政府提出重建地点。以利润为导向的重建模式易于实施,但缺少对城市肌理或具有重要历史意义的城市特性的保存或保护。但是,作为中国共产党第一次全国代表大会召开的地点,其具有深刻的意义,卢湾区(现黄浦区)太平桥社区成为第一个没有遵循这种城市更新模式的社区。这后来促进了新天地的重建和太平桥公园的设计,同时,也推动了中国城市内部的保护运动,并影响了政府官员和房地产开发商看待具有重要文化意义和历史意义的建筑和街区的方式。
The '365 Plan', a regeneration program by the Shanghai Government is launched requiring each district government in Shanghai's city center to propose a location for reconstruction. The profit-driven redevelopment model proved easy to implement but had little regard for the preservation or protection of the urban fabric or the historically significant identity of the city. Nevertheless, a Taipingqiao neighborhood in Luwan District (currently Huangpu District) became the first community that did not follow this model of urban regeneration due to the celebrated significance of the site where the 1st National Congress of the Chinese Communist Party was held. This later resulted into the reconstruction of Xintiandi and creation of Taipingqiao Park. This also helped launch China's movement towards inner-city preservation and influenced the way city officials and real estate developers view culturally significant historic buildings and neighborhoods.“365计划”-更新计划
The '365 Plan', a regeneration program
太平桥总体规划设计已完成,并经上海市政府批准。中国共产党第一次全国代表大会会址在规划阶段和保护周边两个街区方面具有重要的影响力,这两个街区后来形成“新天地”,在保护和利用传统“石库门”式建筑的基础上,保留上海传统“里弄”特色,形成具有商业、零售、娱乐组团的历史风貌街区。东侧与之毗邻的是一处占地4公顷的公园,其中的人工湖设计灵感来自1921年第一次全国代表大会在嘉兴南湖的渔船上成立中国共产党这一历史事件。
1996年太平桥总体规划
1996 Taipingqiao Master Plan
太平桥公园于2000年开工建设,2001年竣工。湖岸区域根据太平桥总体规划,设计了多种业态;北侧是由新建的企业天地所营造的城市商业边缘,结合不同宽度的步行台阶可直达滨水区域。南侧是公园与住宅组团共享的自然边界,丘陵起伏,植被茂盛。公园西侧,有包括“一大会址”在内的历史保护街区新天地,提供文化和旅游功能;公园的东侧是未来地标性商业高层建筑。公园南边还规划了一个与 1921 年在嘉兴南湖上举行的历史性一大会议相呼应的景点——“南湖船”,但最终未呈现。
Construction of Taipingqiao Park was launched in 2000 and completed in 2001. The areas surrounding each side of the lake are designed with various programs according to Taipingqiao's overall master plan; the North side, a commercial urban edge bound by the newly created Corporate Avenue has undulating steps that descend in different widths into the water. The South side is the more natural residential border of the park with rolling hills and lush planting. Its West side, the historically preserved district of Xintiandi including the 'First Congress Hall', is designated for culture and tourism with the East end of the park, a future landmark commercial high-rise building. A 'South Lake boat' linking to the historical First Congress Hall 1921 meeting on a boat on South Lake in Jiaxing was designed but never implemented.
The expansion of The Site of the First CPC National Congress in Taipingqiao Park, to mark China's 100 year celebration of the founding of the Communist Party of China, initiated the redesign and renovation of Taipingqiao Park, the Museums new home. The design challenges are not new, they are more or less the same type of challenges, albeit now more contemporary, the park has experienced as it evolves since its conception in 1996 into what it is today. Administrative, social, economic and environmental momentums continued to shape the parks overall function and character when new designs initially began in 2019.
红旗广场效果图
Flag Plaza Rendering
2021年面临的挑战
2021 Challenges
文化与商业的分离与融合
-Segregation and blending of the cultural and commercial
将公园融入目前的太平桥总体规划发展
-Integrating the park into the current Taipingqiao Master Plan Development
经济效益
-Economics
美学趣味
-Aesthetic
环境友好
-Environmental
总平面图 & 功能分区
Masterplan & Function plan
文化与商业的分离与融合
Segregation and Blending of the Cultural and Commercial
文化与商业的融合,是新天地发展的前所未有的一大特色。以里弄街区中保护与利用传统石库门建筑为基础,打造具有历史特色的零售、娱乐街区。
Blending the cultural and commercial has been previously uniquely accomplished with the development of Xintiandi; a retail and entertainment district with historic characteristics based on the conservation and utilization of traditional Shikumen houses in a Linong neighborhood.
太平桥公园商业与文化的融合本质上并非大相径庭。公园核心区内重新设计新的灵活开放空间,用以继续举办一年一度的上海时装周和新年音乐会,并为中共一大纪念馆建设留出足够的空间。公园东端灵活的开放草坪可以用于举办各种活动,并有空间与条件扩展到济南路和太平湖的最东端以备使用。当需要更大型的场地来开展活动时,安装的可调节水坝可将湖中的小部分水体抽到另一侧。
The merging of the commercial and cultural in Taipingqiao Park is not entirely much different. New flexible open space to allow the continued hosting of the annual Shanghai Fashion Week and New Year Concerts are redesigned within the parks core to segregate and make room for the new location of the Museum of the First CPC National Congress. Festivities are relocated to an open flexible lawn on the east end of the park for events with room to expand over Jinan Road and the far eastern tip of the lake. A retractable dam has been installed so that only a small part of the lake would be recycled if events spill over.
之前上海时装周举办时湖水需全部抽干
Previously Shanghai Fashion Week required the lake to be fully drained
现在当需要更大型的场地来开展活动时,安装的可调节水坝可将湖中的小部分水体抽到另一侧
Currently a retractable dam has been installed so that only a small part of the lake would be recycled if events spill over
上海时装周新地点
New location of Shanghai Fashion Week
活动草坪
Activity Lawn
湖中央设计了高科技全息投影灯光喷泉,可满足不同的商业和文化活动的需求。
A long computerized music and light fountain is added in the middle of the lake that could accommodate both commercial and cultural needs depending on the events held.
规划的整体性
Master Plan Integration
经上海市政府批准的太平桥总体规划设计从规划建设到现在已有25年了。就像所有的城市空间一样,由于持续的、不可预测的经济和社会趋势,太平桥区域今天已经成为一个与10年或15年前大不相同的,具有无限活力的社区。
The master plan design of Taipingqiao as approved by the Shanghai Municipal Government is near completion marking a 25 year span since its inception. Due to continued unpredictable economic and social trends, Taipingqiao has become a much different community today than it was say 10 or 15 years ago as it evolves, as urban space normally do, into the dynamism it is today.
鸟瞰效果图
Overview Rendering
将公园与东端的新商业发展连接起来的计划预计在2024年完成。新天地和新纪念馆通过联通的水景、协调一致的铺装材料、行道树、更加丰富多彩的种植群落、灯具照明和一系列长凳和低矮的挡墙座椅等,能容纳更多户外享用午餐和夜晚前来休憩的人群。
Efforts to connect the park with the new commercial development on its east end, scheduled to be completed in 2024, with Xintiandi and the Museum of the First CPC National Congress are made through the design of connecting water features and the use of consistent paving materials, street trees, a more colorful planting pallet, lighting and a series of built in benches and low sitting walls to accommodate a larger and more outdoor appreciating lunch and evening crowd.
水的流动连接新天地和未来的东侧塔楼
Movement of Water to Connect Xintiandi with the Future East Tower
Fountain Video
DLC效果图
Design Land Collaborative (DLC) Rendering
傍晚时分水幕电影
Water Show at Dusk
东侧特色圆形喷泉
East Round Anchor Fountain
DLC效果图
Design Land Collaborative (DLC) Rendering
东侧特色圆形喷泉
East Round Anchor Fountain
Economics
为了提高地区的特性,我们考虑了预算和投资需求之间的平衡。特别是意识到会有更多的人群将被吸引到这个拥有互动水景,季节性色彩的美丽的公园和重要的文化纪念馆的区域。
The balance between budget and the need to invest in enhancing the identity of a place is considered, especially when understanding that more crowds will be attracted to a beautiful park with interactive water features, seasonal color and an important cultural museum.
园区内设置了优先投资的区域,在公园南端的住宅区内铺设更为经济的红砖路面和开放式草坪,以降低整体成本。
Zones of investment priorities are set within the park to minimize the overall cost impact with less expensive red brick pavers and open rolling lawns within the residential south end of the park.
红砖为园路带来一抹亮色
Red brick give the park lanes a splash of color
传统石库门砌砖样式坐凳矮墙
Sitting walls with the traditional Shikumen brick pattern
而公园北端的商业区则使用黄色花岗岩铺地台阶和木凳,以及更高质量的石材铺装和成熟的开花树木,与中共一大纪念馆的重要性相匹配。
Yellow granite paving steps and timber benches for the commercial north end of the park and higher quality stone pavers and mature flowering trees are to commensurate the importance of the Museum of the First CPC National Congress.
美学趣味
Aesthetics中国共产党一大纪念馆已成为太平桥公园内的一个焦点,太平桥公园及其太平湖也成为太平桥区域总体规划的独特地标。
The Museum of the First CPC National Congress has become a focal point within Taipingqiao Park with the park and its lake a unique landmark identity for the Taipingqiao master plan.
Over time, Taipingqiao Park has been successfully shaped into one of Shanghai’s foremost inner city urban parks. Colorful paving materials, custom timber benches and low sitting brick walls that encourage social interaction, colorful jumping water features, a seasonal colorful planting pallet and the undulating character of the lake and paths encourages social activities, recreation and entertainment and help emphasize the importance of a city's quality of life, its health and wellness.
环境友好
Environmental
全新的提升太平桥公园的适应性与可持续性的方法,包括增加透水铺装,采集实木,构建可持续的排水系统和软化湖区北面减少硬质边缘的应用。原来主导场地商业边界的波浪状延续的硬质台阶,在新的设计中被分为叠落的种植池,配合休息座椅,用以鼓励市民在湖岸交流互动。
A new sensitive and sustainable approach to Taipingqiao Park's upgrades include the addition of permeable paving materials, farmed hard woods, sustainable drainage systems and a softer, less urban northern edge of the lake. The undulating urban steps that previously dominated the commercial edge are now broken into cascading planting beds with benches that encourage social interaction down to the water line.
公园在中国人口快速增长的城市中发挥着越来越重要的作用。政府官员和开发商们都已明白,城市公园带来的诸多积极的社会效益,有助于增加城市生物多样性,减少城市热岛效应,改善空气和水环境质量。显然,中共一大纪念馆和它所在的公园一样,都融合了对于未来的积极的展望。
Parks are playing an increasingly important role in China's fast growing urban population. City officials and developers understand that urban parks help bring positive social benefits, increase urban biodiversity, contribute to the reduction of urban heat island effect and improve air and water quality. It makes perfect sense that The Museum of the First CPC National Congress shares a positive outlook towards the future as the park it sits in.
绿色连接
Green Connection
DLC效果图
Design Land Collaborative (DLC) Rendering
树木移植/移除
Tree Relocation / Removal
树木移植/移除标记
Marking Trees for Relocation / Removal
种植策略
Planting Strategy
和谐相处
In Harmony
We are attracted to the best of public spaces, not because we have to go there, but because we want to be there. A great space is one that is representative of the city with its streets, plazas and squares embodying the form and comfort of urban communities. They are settings for activity that bring people together to react and interact to what the built environment has to offer and are places for escape, romance, dreaming, acting and observing. This is exactly what Taipingqiao Park has evolved into over the last 20 years; designed not by one individual, but born through layers of external momentum and a team of people who celebrate cities and their complexities, contradictions and constraints and promote their continued evolution. This is a story of how cultural heritage as an asset can enhance the identity of a place.
所有图文版权归地茂景观设计咨询(上海)有限公司所有
All copy rights reserved by Design Land Collaborative (DLC)
项目档案/
项目名称:太平桥公园项目地点:上海业主单位:黄浦区绿化和市容管理局代建单位:瑞安房地产有限公司Project Information
Project Name: Taipingqiao Park
Project Location: Shanghai
Client: Huangpu District Landscaping & City Appearance Administrative Bureau
Developer: Shui On Land Limited
Design Consultants
Landscape Architect: Design Land Collaborative Ltd (DLC)
Landscape LDI: East China Architectural Design & Research Institute Co., Ltd.
Lighting Consultant: UNOLAI DESIGN & ASSOCIATES
Hardscape Contractor: Shanghai Zhongsheng Construction Co., Ltd.
Softscape Contractor: Shanghai Jinrui Construction development Co., Ltd.
Water feature Consultant: Shanghai Water Art Technology Co., Ltd.
Structure of Lake bottom & installation: Shanghai Construction No.1 (Group) Co., Ltd.
TPQ Park Consultancy List
Taipingqiao Master Plan (1996): Skidmore, Owings & Merrill LLP, SOM
Chief Architect Xintiandi (2001): Ben Wood Studio Shanghai
Landscape Architect (2001): Peter Walker and Partners
The Museum of the First CPC National Congress Consultancy List
The Museum of the First CPC National Congress Architecture: East China Architectural Design & Research Institute Co., Ltd.
Planting LDI: TRIONES Landscape Design Engineering Co., Ltd.
Hardscape Contractor: Shanghai Construction No.4 (Group) Co., Ltd.
Softscape Contractor: Shanghai Gardens Group Co., Ltd.
伟大的开端 | 中国共产党第一次全国代表大会纪念馆
石库门新貌:老上海辰光里的新时代
再生之路:从一个衰败的历史街区
关注地建师
对接优质资源参与高品质行业活动帮助您和您的项目获得更广泛的业内认可DDF致力于通过邀请全球范围内成功的项目案例分享:设计理念、设计管理经验、技术/产品等多维度进行演说分享、作品展示、企业形象推广等。
旨在协助设计决策者洞察未来趋势,推动行业上下游产业链的健康发展。DDF现场精彩活动:CREDAWARD地产设计大奖·中国、20X20 设计论坛、企业联合精品展示等。
CREDAWARD地产设计大奖