Construction officially started on January 25th
China Builds Impressive New 1,000-Bed Hospital in Just 10 Days!
Construction of Huoshenshan Hospital in Wuhan, with 1,000 beds, was officially completed within 10 days of construction, on February 2nd, 2020.
More than 300 prefabricated container-type stuctures were used.
By January 31st, 90% of the containers had been assembled into the construction area.
Medical equipment installation began on February 1st.
Construction was officially completed on February 2nd.
Source: 报告“云监工”!20200202,火神山医院交付!
The hospital is an infectious disease hospital built specifically to help tackle the new coronavirus. There are three corridors on each floor of the two-story inpatient building, with wards on both sides of the corridor.
2月1日,武汉火神山医院航拍图。
Reporters were told that all medical equipment for the wards meet international standards.
医院病房内,窗户旁边的小窗口是专门用于给病人送食物送药品。
All wards are negatively-pressurized with fresh air exhaust systems to ensure that the pressure in the wards is lower than outside so that the air within the wards is not discharged to the outside environment.
病房内电视机安装到位,可收看20多个频道。
Source: 刚刚,火神山医院交付!4000张照片延时摄影记录建设全过程
Recommended Reading:
Useful Coronavirus-related Chinese Phrases Everyone Should Know
WHO Declares a Public Health Emergency of International Concern
Coronavirus Prompts Strict New Mask Requirements & City Lockdown
Scan the QR Code, or click the 'Read more' link below to follow ShekouDaily for news & info to enjoy life in Shenzhen