有BEP才有真BIM-BEP BIM Execution Plan案例

2017-07-05 Rein Wang BIM学习网

BEP  BIM, PxP 工作执行计划书

1.定义介绍  Abbreviation and Definition

2.BIM执行计划说明 BIM Execution Plan and Introduction

3.计划信息Project Information

4.BIM作业目标与应用 BIM Goal and Use

5.BIM人员配置与职责 BIM Manpower Deployment and Responsibilities

6.BIM作业流程BIM Operation Procedure

7.协同作业程序Coordination Operation Procedure

8.BIM信息交换与整合 BIM Information Exchange and Integration

9.品质控管Quality Control

10.BIM交付内容、时程与策略  BIM Deliverables, ScheduleAnd Strategy

11.建模标准BIM Model Standards

12.施工模型建置整合计划 Integration Plan for Construction Model

13.BIM管理模型建置作业规定 BIM Management Model Implementation Rules

附录Appendix 模型发展程度范例 The Extent of ModelDevelopment (Sample)

 

1.定义介绍  Abbreviation and Definition

1.1  BIM相关定义 BIM Definition

DCBEP 设计时间BIM 执行计划书(DC BIM Execution Plan)

CSBEP 施工阶段BIM 执行计划书(CS BIM Execution Plan)

CDE 共同数据环境 (Common Data Environment)

EIR 业主需求信息(Employer’s Information Requirements)

LoD 模型建置精细度(Level Of Detail)

LoI 模型涵盖信息程度(Level OfInformation)

ICT 信息通讯系统( InformationCommunication Technology System)

VDC 虚拟设计与营建技术(Virtual Design Construction)

RFP 招标公告( Request for Proposal)

RFI 设计释疑(Request for Information)

 

1.2  计划角色 Project Role Definition

OIC 业主BIM主办(Project Owner In Charge)

EA 工程司 (Engineer Agency)

PM 计划主持人/计划经理(Project In Charge)

PMO 计划管理办公室(Project Management Office)

BPM 计划BIM主办(BIMProject Manager)

BMT 计划BIM管理团队(BIMManger team)

AIC 计划BIM建筑主办 (Project Architecture In Charge)

MIC 计划BIM机电主办(Project MEP In Charge)

SIC 计划BIM结构主办 (Project Structure In Charge)

UIC 计划BIM应用主办 (Project BIM Application In Charge)

OWN 业主BIM参与人员 (Owner BIM Participant)

GC 工程管理顾问(General Consultant)

DC 设计顾问(Design Consultant)

GCBPM 工程管理顾问BIM主办(General Consultant BIM Project Manager )

GCBMT 工程管理顾问BIM参与人员(Consultant Team)

CS/XIC 承包商 (Construction Contractor)

 

2.BIM执行计划说明 BIM Execution Plan and Introduction

BIM建筑信息模型化(Building Information Modeling)利用三维模型作为工程全生命周期信息整合及管理的一种手段。

BIM在计划过程中除了以虚拟设计及虚拟建造VDC,优化工程成果外,其最主要目的就是产出及搜集业主需求信息EIR,以利业主透过BIM将计划永续发展。

本BIM执行计划仍依RFP中的EIR描述,为本工程全生命周期规范及描述了本计划的BIM用语。

BIM的作业目标

信息环境

BIM管理人员的组织

BIM所介入的工作流程

共享软件及其版本

产出成果之命名方法

计划各阶段的模型信息需求及相关信息之质量要求应作为本计划BIM执行的依据。

 

3.计划信息 Project Information

3.1   计划业主 Client

3.2   计划名称 Project Title

3.3   计划简介 Project Brief Summary

3.4   计划工期 Project Schedule

3.5   计划位置及范围 Project Location andCoverage

3.6   契约型态/成果交付方法 Contract Type and Delivery Method

3.7   BIM交接与培训计划 BIM Handover Plan andBIM Training Plan

3.8   各专业所使用之软件信息 File type used bydisciplines

3.9   BIM模型里程碑 BIM Model Milestones

3.10  BIM计划负责人 BIM Project Manager

 

3.7BIM交接与培训计划 BIM Handover Plan and BIM Training Plan(示例)

业主及审查人员训练课程大纲 Outline of Client and Reviewer Training Program

 

3.8   各专业所使用之软件信息 File type used bydisciplines(示例)

 

3.9   BIM模型里程碑 BIM Model Milestones(示例)


4.BIM作业目标与应用 BIM Goal and Use

基本设计阶段Basic Design Stage

空间量体规划 Programming

既有状态塑模 Modeling

利用模型最佳方案选择 Optimal Plan Selection with the Model

模型 44 33607 44 15043 0 0 2842 0 0:00:11 0:00:05 0:00:06 2843出空间用途、面积明细表 Spatial Information from Model

初步绿能分析 Preliminary Green Energy Analysis

模型产出数量报表 Quantity Sheets

组件检核纪录 Elements Inspection Record

模型整合至地理信息系统 Integrating Model to GIS

地理信息系统 3D GIS

专业冲突检核报告及解决方案 Professional Conflict Report and Solutions

其他建物与系统机电 Other Buildings and Mechanical/Electrical Components

 

细部设计阶段Detailed Design Stage

既有状态塑模 Modeling

模型产出设计图Model Output Drawing

利用模型最佳方案选择 Optimal Plan Selection with the Model

模型产出空间用途、面积明细表 Spatial Information from Model

模型产出数量报表 Quantity Sheets

组件检核纪录 Elements Inspection Record

4D工序模拟 4D Procedure Simulation

模型整合至地理信息系统 Integrating Model to GIS

地理信息系统 3D GIS

 专业冲突检核报告及解决方案 ProfessionalConflict Report and Solutions

 专业施工模型及整合协调模型 Constructionmodel and coordination model from different professionals

 其他建物与系统机电 Other Buildings andMechanical/Electrical Components

 建构信息存取之系统 Information AccessSystem Construction

 维护管理模型置入信息 Maintenancemanagement model into information

 

施工阶段Construction Stage

有状态塑模 Modeling

模型产出设计图/施工图 Model Output Drawing/ ConstructionDrawing

利用模型最佳方案选择 Optimal Plan Selection with the Model

模型产出数量报表 Quantity Sheets

组件检核纪录 Elements Inspection Record

4D工序模拟 (包含交通维持计划) 4D Procedure Simulation(Including Traffic maintenance plan)

专业冲突检核报告及解决方案 Professional Conflict Report and Solutions

专业施工模型及整合协调模型 Construction model and coordination model from differentprofessionals

维护管理模型置入信息 Maintenance management model into information

竣工模型修正及搜集 As-Built Model correction and collection

 

运维护阶段Operation Maintenance Stage

专业冲突检核报告及解决方案 Professional Conflict Report and Solutions

管理模型制作 Management Model Production

维护信息置入管理模型 Maintain information into management model

 

5.BIM人员配置与职责 BIM Manpower Deployment and Responsibilities

5.1计划BIM组织 BIM Organization

计划主持人/计划经理 Project In charge (PMO)

BIM计划经理(BPM)与其团队(BMT) BIM Project Manager (BPM) and BIM Management Team (BMT)

计划BIM建筑主办 Architecture In-charge (AIC)

计划BIM结构主办 Structure In-charge (SIC)

计划BIM机电主办 MEP In-charge(MIC)

计划BIM应用主办 Project BIM Application In-charge(UIC)

计划BIM设计/建模人员 BIMDesign / Operator(BOP)

合署BIM工程师 Dispatch BIM Engineer

 

5.2协作组织 Collaborating Organizations

 业主BIM主办 Owner BIM In-charge (OIC)

 业主BIM参与人员 Owner BIM Participant (OWN)

 工程管理顾问BIM主办 General Consultant BIM Project Manager (GC BPM)

 工程管理顾问BIM参与人员General Consultant BIM Management Team (GC BMT)

 承包商BIM主办 Contractor—BIM In-charge (XIC)

 

6.BIM作业流程 BIM Operation Procedure

 

7.协同作业程序 Coordination Operation Procedure

7.1公共数据环境 Common Data Environment

7.2BIM界面协调会议  BIM Interface CoordinationMeeting

 

8.BIM信息交换与整合 BIM Information Exchange and Integration

信息交换工作内容清单 List of Information Exchange Worksheets

既有状态模型 (Existing Conditions Modeling)

成本估算 (Cost Estimation)

4D模型 (4DModeling)

空间量体规划 (Programming)

现地分析 (Site Analysis)

设计审视 (Design Reviews)

设计创作 (Design Authoring)

能源分析 (Energy Analysis)

结构分析 (Structural Analysis)

光源分析 (Lighting Analysis)

3D坐标系统(3D Coordination)

空间控制与规划 (3D Control and Planning)

模型纪录 (Record Modeling)

维运排程 (Maintenance Scheduling)

建物系统分析 (Building System Analysis)

 

9.品质控管 Quality Control

9.1品质控管目标 Goal of Quality Control

9.2自主检验 Self-inspections

9.3品质控管检查时机/检查任务/检查频率Coordination Meeting of Inspections, Inspection Frequency, and Inspection Workof Design Consultant

 

10.BIM交付内容、时程与策略  BIM Deliverables, ScheduleAnd Strategy

10.1交付项目与期程 BIM Deliverables and Schedule

10.2交付文件格式  Deliverable File Formats

 

11.建模标准 BIM Model Standards

11.1模型规定 Model Specifications

11.1.1档案命名原则 The naming rules

11.1.2组件建置原则 Element Build-up Rule

11.1.3模型拆分原则 The model Split Criteria

11.1.4单位、原点及网格 Unit, Origin and Grid

11.1.5色彩计划  Color Plan

11.2模型发展程度 The Extent of Model Development

11.3数量计算规定 Quantity Calculation Rule

11.4图说规定 Drawing Specification

 

12.施工模型建置整合计划 Integration Plan for Construction Model

12.1发展施工模型 Construction Model

12.1.1 传统工程发包模式之施工模型 Constructionmodel for DBB

12.1.2统包工程发包模式(特殊系统)之施工模型 Construction models of specialsystems for Turnkey

12.1.3施工模型整合规划Construction models integration plan

 

13.BIM管理模型建置作业规定 BIM Management Model Implementation Rules

13.1BIM管理模型作业流程 BIM Management Model Operation Flow Chart

13.2BIM管理模型建置计划书 BIM Management Model Implementation Plan

13.3BIM管理模型内容 Content of BIM Management Model

13.3.1      BIM管理模型中的设施设备信息Facility/equipment-related information in the BIM Management Model

13.3.2      BIM竣工模型中的设施设备相关数字化文件Facilities/equipmentrelated digital document in BIM As-Built Model

13.3.3      BIM管理模型拆分 BIM Management ModelSegmentation

13.3.4      BIM管理模型减量及优化 BIM ManagementModel downsizing and optimization

13.3.5      BIM管理模型信息输出 BIM Management ModelInformation Output

 

附录Appendix 模型发展程度范例 The Extent of ModelDevelopment (Sample)


精华原创:

BIM工程师 | BIM技术经理 | BIM+FM | BIM联动三领域 | 一带一路新观点 | 建筑业十三五规划 | BIM学习网原创合集1 | BIM执行计划 | 项目级BIM应用标准 | 万科的科技化之路 | 数据才是BIM本质 | BIM硬件原理 | 装配式建筑&BIM | 绿色建筑&BIM | BIM入门四本书 | BIM工程管理方法体系 | 万科新三好住宅 | 阿里进击不动产交易 | 不动产运营精华1 | 不动产运营案例集1 | 迪拜之城的崛起  | 万科合作建房模式  |  BIM26大失败 | 统一建筑语境的BIM+FM  | BIM RFP | BIM文档逻辑地图 | IPD思想与BIM价值  | IPD合同深度解析 | 数据驱动空间价值 | FM国际趋势 |